Construction Specialties

Protección de paredes | Juntas de dilatación| Alfombrillas de entrada / Protección solar

+34 96 127 32 96
Menú
  • Inicio
  • Productos
    • Acrovyn® Protección de paredes y puertas
      Puertas y protección de puertas Acrovyn®
      Revestimientos para paredes personalizados Acrovyn by Design®
      Juntas de dilatación Couvraneuf®
      Alfombras de entrada
      Alfombras de entrada Pedisystems®
      Celosías arquitectónicas
      Celosías arquitectónicas
      Exterior Solar Shading
  • Proyectos
  • Blog
  • Recursos
    • Folletos
      Market Sectors
  • Sobre nosotros
  • Contacto
  • Careers

Leipzig South Combined Heat and Power Plant – Leipzig, Germany

Leipzig South Combined Heat and Power Plant

Leipzig, Germany

Leipzig South Combined Heat and Power Plant

Leipzig, Germany

Acerca del proyecto

The Leipzig South Combined Heat and Power (CHP) Plant represents a significant milestone in Germany’s energy transition, setting a benchmark for low-emission energy production. Built on the site of the historic Ernst Thälmann power plant, the new facility combines advanced Siemens gas turbines with state-of-the-art burner technology, hot water generators, and catalysts, ensuring minimal nitrogen oxide and carbon monoxide emissions. With an overall efficiency exceeding 93%, the plant supplies heat and power to the city while maintaining environmental sustainability.

Design goals

Given the plant’s focus on sustainability and efficiency, the design team sought high-quality, durable ventilation solutions that could support essential airflow requirements while maintaining effective rain defence. The challenge was to ensure optimal ventilation in plant rooms while also providing a visually consistent design across the functional and screening areas of the building envelope. Additionally, the louvres needed to withstand the demands of a high-performance industrial setting while complementing the architectural vision of the facility.

Construction Specialties (CS) was engaged to provide a solution that balanced functionality whilst integrating seamlessly with the aesthetics across multiple parts of the facility.

Solución

To meet these requirements, CS supplied its RSH-5700AL Rain Defence Louvres, selected for their proven performance in maintaining airflow efficiency while providing robust protection against wind-driven rain ingress. Tested to the EN 13030, these louvres achieve Class A rain defence up to 3.0m/s while ensuring effective airflow in both intake and exhaust applications.

The louvres were required for three of the power plant’s buildings. In the Main Power Plant, finished in RAL 070 70 50 (Honeycomb Yellow), 110m2 of louvres span the West elevation. The RSH-5700 model features a recessed mullion at the joints between modules, creating a continuous line appearance on the façade.

Additionally, three areas of the rooftop plant level were fitted with the same model, even though the primary functional requirement in those areas was screening. The architect opted for the rain defence louvre to maintain a uniform aesthetic across the facility.

Rain defence louvres were also supplied for the Gas Supply Facility and the Pump House. Distributed across multiple sections, totalling approximately 135m²,  the louvres were polyester powder-coated in Rust (RAL 040 50 30) and Brick Brown (RAL 030 40 30) to complement the exterior envelope.

The project involved extensive collaboration between CS and the planning team to ensure optimal product selection and integration. These consultations were highly valued by the project stakeholders and played important role in achieving a well-coordinated implementation.

The final installation of CS louvres not only provided essential ventilation and rain defence but also contributed to the overall efficiency and resilience of the plant.

The facility was constructed in just over three years, opening on 23 October 2023. It now plays a key role in Leipzig’s plan to increase district heating coverage to over 50%, with future provisions to integrate hydrogen-based energy solutions.

¿Qué hacer a continuación?

DESCARGAR CATÁLOGO
CONTACT US
REQUEST PRICING
ORDER A SAMPLE
ASK A QUESTION

Filed Under: Louvres, Projects Tagged With: Power Generation, Rain Defence Louvres, RSH-5700AL

Celosías de lamas

Celosías arquitectónicas (2022)

Llevamos más de 60 años fabricando y vendiendo celosías en todo el mundo. Cuando opta por nuestros sistemas, está optando también por la inestimable ayuda de un equipo dedicado con una amplia experiencia y capacidad de diseño.

El rendimiento de nuestros sistemas de celosías ha sido puesto a prueba por terceros independientes. Además, cualquiera de nuestras soluciones estándar o a medida puede ponerse a prueba en nuestra propia cámara de pruebas a fin de garantizar que estarán a la altura del nivel de rendimiento especificado en condiciones reales.

+34 96 127 32 96
info@c-sgroup.es
Pida una muestra
Solicite un presupuesto
Obtenga asistencia técnica

Menú

  • Productos CS
  • Proyectos
  • Blog
  • Sobre nosotros
  • Contacte con nosotros
  • Elija un país

Contacto

Construction Specialties
C/ 25, nº10
46470 Catarroja (Valencia)
España
Tel.: +34 96 127 32 96
Fax: +34 96 127 32 97
Correo electrónico: info@c-sgroup.es

Confidencialidad

Este sitio web utiliza cookies que nos ayudan a ofrecerle la mejor experiencia posible cuando visite nuestra página web. Al continuar usando este sitio web, usted da su consentimiento para que utilicemos dichas cookies. Averigüe más sobre el uso que damos a las cookies y cómo las gestionamos en virtud de nuestra política de confidencialidad.
Política de privacidad

Derechos de autor © 2025 · Construction Specialties

Copyright © 2025 · Genesis Framework · WordPress · Log in